泛欧电力系统概率充裕性评估应用及启示
何剑
中国电力科学研究院有限公司,北京市 海淀区 100192
Application of Pan-European Power System Probabilistic Adequacy Assessment and Its Inspiration
HE Jian
China Electric Power Research Institute, Haidian District, Beijing 100192, China
下载:  PDF(522KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 概率方法是客观全面评估大规模可再生能源接入条件下电力系统充裕性的有效手段。2017年,欧洲输电运营商联盟(ENTSO-E)发布了首份中期充裕性预测报告(MAF),首次在泛欧区域内开展概率充裕性评估应用,是将概率性评估方法正式纳入电网规划运行常规工作的典型案例,具有重要的标志性意义和借鉴意义。分析总结了泛欧电力系统概率充裕性评估的驱动力,从评估指标、数据建模和仿真方法等方面介绍了泛欧电力系统概率充裕性评估的特点,对其实际应用案例评估结果进行了分析,并结合我国现状,从建立充裕性评估的标准、评价指标和数据模型等方面提出了建议,希望对我国电力系统可靠运行和促进新能源消纳具有借鉴意义。
服务
加入引用管理器
E-mail Alert
RSS
作者相关文章
何剑
关键词:  概率  泛欧电力系统  充裕性评估  欧洲输电运营商联盟  气象信息    
Abstract: Probabilistic methodology is useful to assess adequacy of power systems integrated with large scale renewable energy. European Network of Transmission System Operators for Electricity (ENTSO-E) published the Mid-term Adequacy Forecast (MAF) report for the first time in 2017, presenting the first Pan-European probabilistic adequacy assessment. This could be taken as an exemplary case to implement probabilistic methodology in power system planning and operation, very symbolic and offering valuable experiences. This paper analyzed the driving force of the Pan-European probabilistic adequacy assessment, and introduced its features from aspects of indices, models, simulation method and so on. Then, the results of typical study cases were interpreted. Finally, according to current situation in China, suggestions of establishing adequacy assessment standard, index criteria, database and models were proposed to support secure operation of power system and promote renewable energy accommodation.
Key words:  probabilistic    pan-European power system    adequacy assessment    ENTSO-E    climate information
收稿日期:  2017-09-18                     发布日期:  2018-08-08      期的出版日期:  2018-08-05
ZTFLH:  TM721  
作者简介:  何剑(1983),男,博士,高级工程师,通信作者,主要从事电力系统可靠性、电力系统分析与控制等方面的研究,E-mail:hejian@epri.sgcc.com. cn。
引用本文:    
何剑. 泛欧电力系统概率充裕性评估应用及启示[J]. 电网技术, 2018, 42(8): 2681-2686.
HE Jian. Application of Pan-European Power System Probabilistic Adequacy Assessment and Its Inspiration. POWER SYSTEM TECHNOLOGY, 2018, 42(8): 2681-2686.
链接本文:  
http://www.dwjs.com.cn/CN/10.13335/j.1000-3673.pst.2017.2273  或          http://www.dwjs.com.cn/CN/Y2018/V42/I8/2681
[1] Billinton R,Allan R N.Reliability evaluation of power systems[M].2nd ed.New York and London:Plenum Press,1996.
[2] 李文沅. 电力系统风险评估模型、方法和应用[M].北京:科学出版社,2006.
[3] 程林,何剑.电力系统可靠性原理和应用[M].2版.北京:清华大学出版社,2015:1-6,280-319.
[4] 刘文霞,单晓东,江伟民,等.北美大电力系统可靠性风险评估体系及启示[J].电网技术,2016,40(12):3811-3817.
Liu Wenxia,Shan Xiaodong,Jiang Weimin,et al.Risk assessment system of NERC bulk power system and its inspiration[J].Power System Technology,2016,40(12):3811-3817(in Chinese).
[5] 张玥,王秀丽,曾平良.欧洲低碳电力路线分析[J].电网技术,2016,40(6):1675-1682.
Zhang Yue,Wang Xiuli,Zeng Pingliang.Analysis of European low carbon electricity roadmap[J].Power System Technology,2016,40(6):1675-1682(in Chinese).
[6] 雷晓蒙,刘舫,周剑,等.欧盟国家统一电力市场化改革分析[J].电网技术,2014,38(2):431-439.
Lei Xiaomeng,Liu Fang,Zhou Jian,et al.Analysis on the internal electricity market reform of EU countries[J].Power System Technology,2014,38(2):431-439(in Chinese).
[7] ENTSO-E.Mid-term Adequacy Forecast(Edition2016)[R/ OL].Brussels,Belgium:ENTSO-E,March 2017.https://www.entsoe. eu/Documents/SDC%20documents/MAF/ENSTOE_MAF_2016.pdf.
[8] ENTSO-E.MAF2016 Consultation Feedback Report[R/ OL].Brussels,Belgium:ENTSO-E,March 2017.https://www. entsoe.eu/Documents/SDC%20documents/MAF/MAF_consultation_answers.pdf.
[9] PLEF TSOs.Pentalateral generation adequacy probabilistic assessment[R/OL].Brussels,Belgium:Pentalateral Energy Forum,2015.http://www.benelux.int/files/4914/2554/1545/Penta_generation_adequacy_assessment_REPORT.pdf.
[10] Andrychowicz M,Przybylski J.Evaluation of the flexibility approach in construction of scenario outlook & adequacy forecast 2015 by ENTSO-E[C]//2016 13th International Conference on the European Energy Market(EEM),Porto,2016:1-5.
[11] Doquet M,Fourment C,Roudergues J M.Generation & transmission adequacy of large interconnected power systems:A contribution to the renewal of Monte-Carlo approaches[C]//2011 IEEE Trondheim PowerTech.Trondheim,2011:1-6.
[12] Das K,Litong-Palima M,Maule P,et al.Adequacy of operating reserves for power systems in future European wind power scenarios[C]//2015 IEEE Power & Energy Society General Meeting.Denver,CO,2015:1-5.
[13] ENTSO-E.Electricity in Europe2015[R/OL].Brussels,Belgium:ENTSO-E,June 2016.https://www.entsoe.eu/Documents/ Publications/Statistics/electricity_in_europe/entsoe_electricity_in_europe_2015_web.pdf.
[14] ENTSO-E.Statistical Factsheet2015[R/OL].Brussels,Belgium:ENTSO-E,May 2016.https://www.entsoe.eu/publications/statistics/ statistical-factsheet/Pages/default.aspx.
[15] 鲁宗相,李海波,乔颖.含高比例可再生能源电力系统灵活性规划及挑战[J].电力系统自动化,2016,40(13):147-158.
Lu Zongxiang,Li Haibo,Qiao Ying.Power system flexibility planning and challenges considering high proportion of renewable energy[J].Automation of Electric Power Systems,2016,40(13):147-158(in Chinese).
[16] ENTSO-E.Scenario outlook and system adequacy forecast2011- 2025[R/OL].Brussels,Belgium:ENTSO-E,2011.https:// www. entsoe.eu/fileadmin/user_upload/_library/SDC/SOAF/ENTSOE_SO_AF_2011-2025.pdf.
[17] ENTSO-E.Scenario outlook & adequacy2015[R/OL].Brussels,Belgium:ENTSO-E,June 2015.https://www.entsoe.eu/Documents/ SDC%20documents/SOAF/150630_SOAF_2015_publication_wcover.pdf.
[18] ENTSO-E.ENTSO-E target methodology for adequacy assessment (Updated Version after Consultation)[R/OL].Brussels,Belgium:ENTSO-E,Oct2014.https://www.entsoe.eu/Documents/SDC% 20documents/SOAF/141014_Target_Methodology_for_Adequacy_Assessment_after_Consultation.pdf.
[19] ENTSO-E.Winter Outlook Report 2016/2017 and Summer Review 2016[R/OL].Brussels,Belgium:ENTSO-E,29 Nov 2016.
[20] RTE.A New Tool for Adequacy Reports and Economic Simulations.[OL]Available:http://antares.rte-france.com.July 2018.
[21] Poyry.BID3:Poyry’s Power Market Model.[OL]Available:http://www.Poyry.com/BID3.July 2018.
[22] CESI.Grid reliability and adequacy risk evaluator.[OL]Available:http://www.cesi.it/grare.July 2018.
[23] Energy Exemplar.PLEXOS Simulation Software.[OL]Available:https://energyexemplar.com/products/plexos-simulation-software/ .July 2018.
[24] ENTSO-E.Mid-term adequacy forecast(Edition 2017)[R/OL].Brussels,Belgium:ENTSO-E,Dec 2017.https://docstore.entsoe.eu/Documents/ SDC%20documents/MAF/MAF_2017_report_for_consultation.pdf.March 2018.
[25] 国家能源局.2017年全国电力工业统计数据[OL].http://www.nea. gov.cn/2018-01/22/c_136914154.htm.[2018-1-22].
[26] 国家发展改革委,国家能源局.电力发展“十三五”规划(2016-2020年)(发布稿)[R/OL].http://www.ndrc.gov.cn/fzgggz/fzgh/ghwb/gjjgh/ 201706/t20170605_849994.html.[2017-6-5].
[27] 周孝信,鲁宗相,刘应梅,等.中国未来电网的发展模式和关键技术[J].中国电机工程学报,2014,34(29):4999-5008.
Zhou Xiaoxin,Lu Zongxiang,Liu Yingmei,et al.Development models and key technologies of future grid in China[J].Proceedings of the CSEE,2014,34(29):4999-5008(in Chinese).
[28] 国家电网公司组编.电力可靠性管理基础[M].北京:中国电力出版社,2012:13-15.
[29] 郑望其,程林,孙元章.2005年南方电网可靠性充裕度评估[J].电网技术,2004,28(19):5-8.
Zheng Wangqi,Cheng Lin,Sun Yuanzhang.Adequacy evaluation for South China Electric Power Grid in 2005[J].Power System Technology,2004,28(19):5-8(in Chinese).
[30] 谢海鹏,何剑,别朝红,等.基于二阶锥切负荷模型的大规模交直流混联电网可靠性评估[J].电网技术,2016,40(12):3761-3767.
Xie Haipeng,He Jian,Bie Zhaohong,et al.Reliability evaluation of large-scale hybrid AC/DC grids based on SOCP load shedding model[J].Power System Technology,2016,40(12):3761-3767(in Chinese).
[31] 纪静,谢开贵,曹侃,等.广东电网薄弱环节辨识及可靠性改善分析[J].电力系统自动化,2011,35(13):98-102.
Ji Jing,Xie Kaigui,Cao Kan,et al.Weak part identification and reliability improvement analysis of Guangdong power grid[J].Automation of Electric Power Systems,2011,35(13):98-102(in Chinese).
[1] 陈莹, 王松岩, 陈彬, 徐泰山, 郁琛, 于继来. 台风环境下考虑地理高程信息的输电通道结构失效故障概率评估方法[J]. 电网技术, 2018, 42(7): 2295-2302.
[2] 徐谦, 方卜珣, 兰洲, 程浩忠, 刘佳. 输电网规划模型中失负荷概率约束的嵌入及转化方法研究[J]. 电网技术, 2018, 42(6): 1760-1767.
[3] 彭虹桥, 顾洁, 宋柄兵, 马睿, 时亚军. 基于多维变量筛选-非参数组合回归的长期负荷概率预测模型[J]. 电网技术, 2018, 42(6): 1768-1775.
[4] 肖青, 周少武. 基于改进降维法的概率潮流计算[J]. 电网技术, 2018, 42(5): 1565-1572.
[5] 吕颖,鲁广明,谢昶,戴红阳,于之虹,严剑峰. 考虑大规模集中接入风电功率波动相关性的[J]. 电网技术, 2018, 42(4): 1140-1148.
[6] 苏建军, 郭跃进, 刘萌, 张国辉, 王大鹏. 紧急切负荷措施的温控负荷控制策略及概率模型[J]. 电网技术, 2018, 42(3): 911-917.
[7] 张世达, 孙永辉, 卫志农, 孙国强, 李逸驰. 考虑可控光伏系统概率模型的主动配电网日前优化调度[J]. 电网技术, 2018, 42(1): 247-253.
[8] 王利猛, 刘久成, 田春光, 李国庆, 魏文震. 基于统计学方法的微网混合储能容量优化配置[J]. 电网技术, 2018, 42(1): 187-194.
[9] 李滨, 覃芳璐, 李倍存, 吴茵, 李佩杰. 基于改进SLIQ算法及多粒度气象信息匹配的短期负荷预测[J]. 电网技术, 2018, 42(1): 291-300.
[10] 范婷婷, 杜松怀, 刘科研, 苏娟. 计及输入变量相关性的有源配电网可靠性概率评估三点估计法[J]. 电网技术, 2017, 41(7): 2324-2331.
[11] 柳志航, 卫志农, 孙国强, 臧海祥, 李逸驰. 计及参数模糊性的含风电场电力系统概率潮流计算[J]. 电网技术, 2017, 41(7): 2308-2315.
[12] 叶一达, 魏林君, 乔颖, 李琰, 鲁宗相. 非参数条件概率预测提高风电消纳的优化方法[J]. 电网技术, 2017, 41(5): 1443-1450.
[13] 王颖, 周刚, 韩红卫, 李婷, 丁恰, 张凯锋. 计及风电最优置信度的机组组合优化方法[J]. 电网技术, 2017, 41(3): 808-815.
[14] 尹青, 杨洪耕, 马晓阳. 含大规模风电场的电网概率无功优化调度[J]. 电网技术, 2017, 41(2): 514-520.
[15] 程泽, 刘冲, 刘力. 基于相似时刻的光伏出力概率分布估计方法[J]. 电网技术, 2017, 41(2): 448-454.
[1] . Wave Reflection Energized by Multi-Pulse Width Modulation Sources in Distributed Power System [J]. Power System Technology, 2006, 30(1): 19 -22 .
[2] ZHONG Wu-zhi SONG Xin-li TANG Yong BU Guang-quan WU Guo-yang LIU Tao. Small Signal Stability Analysis for UHV AC/DC Power Grids[J]. Power System Technology, 2010, 34(3): 1 -4 .
[3] ZHANG Jianhua SU Ling CHEN Yong SU Jing WNAG Li. Energy Management of Microgrid and Its Control Strategy[J]. Power System Technology, 2011, 35(7): 24 -28 .
[4] GOU Moufa, CHEN Jingjie, ZHANG Weijun, YANG Gengjie, MIAO Xiren. A Novel Approach for Fault Arc Extinguishing and Feeder Selection in Distribution Networks Based on Single-Phase Cascade H-Bridge Converter[J]. Power System Technology, 2015, 39(9): 2677 -2684 .
[5] MA Meiting, YUAN Tiejiang, CHEN Guangyu, CAI Gaolei, PENG Shengjiang, ZHANG Zengqiang. Analysis on Economic Benefit of Energy Storage in Auxiliary Service of Wind Power[J]. Power System Technology, 2016, 40(11): 3362 -3367 .
[6] HE Yubin, GUO Jia, SHEN Jianrong, GUO Chuangxin, ZHU Bingquan, XU Lizhong. Decentralized Synergetic Dispatch of Interconnected Power Systems With Risk-Based Locational Marginal Price[J]. Power System Technology, 2017, 41(8): 2462 -2468 .
[7] XIAO Yunqi, HE Guanju, WANG Kunpeng, YANG Xiyun. De-Load Control Strategy for Variable Speed Wind Turbine Generation Units Under Constraint of Power Grid[J]. Power System Technology, 2014, 38(2): 456 -462 .
[8] . A Survey on Detection Algorithm and Restoring Strategy of Dynamic Voltage Restorer[J]. Power System Technology, 2006, 30(6): 23 -29 .
[9] YAO Jun|LIAO Yong|QU Xing-hong|LIU Ren .

Optimal Wind-Energy Tracking Control of Direct-Driven Permanent Magnet
Synchronous Generators for Wind Turbines

[J]. Power System Technology, 2008, 32(10): 11 -15 .
[10] WANG Baoyi, ZHAO Shuo, ZHANG Shaomin. A Distributed Load Forecasting Algorithm Based on Cloud Computing and Extreme Learning Machine[J]. Power System Technology, 2014, 38(2): 526 -531 .
Viewed