| 计及气象灾害因素的电网规划方法 | |||||||||||||||||||||||||||||||||||||||||||
| 陈皓勇,胡斌,叶荣 | |||||||||||||||||||||||||||||||||||||||||||
| 华南理工大学 电力学院,广东省 广州市 510640 | |||||||||||||||||||||||||||||||||||||||||||
| 摘要:
针对电网规划中提高电网抗灾能力和维持合理造价间的矛盾,引入差异化的决策变量,对应差异化的抗灾能力和造价,建立了计及气象灾害因素的多目标电网规划模型,给出了基于蒙特卡罗仿真和多目标遗传算法NSGA-II的求解方法。通过Graver-6系统算例证明了在规划过程中考虑气象灾害因素的必要性,所提方法能求得兼顾经济性与可靠性的规划方案,适用于灾害频发环境下的电网规划。 | |||||||||||||||||||||||||||||||||||||||||||
| 关键词: 气象灾害 多目标规划 差异化决策变量 蒙特卡罗仿真 | |||||||||||||||||||||||||||||||||||||||||||
| Transmission Network Planning Considering Weather Disaster | |||||||||||||||||||||||||||||||||||||||||||
| CHEN Hao-yong ,HU Bin ,YE Rong | |||||||||||||||||||||||||||||||||||||||||||
| School of Electric Power,South China University of Technology,Guangzhou 510640,Guangdong Province,China | |||||||||||||||||||||||||||||||||||||||||||
| Abstract:
To resolve the contradiction between enhancing anti-disaster ability of power network and sustaining rational construction cost, by means of leading in discrepant decision variables and corresponding to discrepant anti-disaster ability and construction cost a multi-objective power network planning model is built in which the meteorological disaster factor is taken into account, and the solving method based on Monte Carlo simulation and multi-objective genetic algorithm, namely NSGA-II, is given. The necessity of considering meteorological disaster factor during power network planning is proved by Graver 6-bus system. Using the proposed method, the planning scheme in which considers both economy and reliability can be obtained, so it is suitable to the power network planning for the region where disasters frequently occur. | |||||||||||||||||||||||||||||||||||||||||||
| Keywords: weather disaster multi-objective planning discrepant decision variable Monte Carlo simulation | |||||||||||||||||||||||||||||||||||||||||||
| 收稿日期 2009-03-02 修回日期 2009-04-13 网络版发布日期 2009-12-25 | |||||||||||||||||||||||||||||||||||||||||||
| DOI: | |||||||||||||||||||||||||||||||||||||||||||
| 基金项目: | |||||||||||||||||||||||||||||||||||||||||||
| 通讯作者: 胡斌 | |||||||||||||||||||||||||||||||||||||||||||
| 作者简介: 陈皓勇(1975—),男,教授,主要研究方向为电力系统优化规划和优化运行、电力市场理论及应用、计算智能在电力市场和电力系统中的应用等; 胡斌(1984—),男,硕士研究生,主要从事电网系统规划、配网重构与可靠性分析、电力市场的研究,E-mail:eee456@163.com; 叶荣(1985—),男,硕士研究生,主要从事电网系统规划、配网重构与可靠性分析、电力市场的研究,E-mail:yerong1985@sina.com。 | |||||||||||||||||||||||||||||||||||||||||||
| 作者Email: eee456@163.com | |||||||||||||||||||||||||||||||||||||||||||
|
| |||||||||||||||||||||||||||||||||||||||||||
| 参考文献: | |||||||||||||||||||||||||||||||||||||||||||
[1] 赖业宁,薛禹胜,王海风.电力市场稳定性及其风险管理[J].电力系统自动化,2003,27(12):18-24. Lai Yening,Xue Yusheng,Wang Haifeng.Electricity market stability and its risk management[J].Automation of Electric Power Systems,2003,27(12):18-24(in Chinese). [2] 蔡磊,张焰,程浩忠.考虑系统暂态稳定性的电网规划方法[J].电力系统自动化,2001,25(6):45-48. Cai Lei,Zhang Yan,Cheng Haozhong.Transmission network planning incorporating transient stability[J].Automation of Electric Power Systems,2001,25(6):45-48(in Chinese). [3] 程浩忠,高赐威,马则良,等.多目标电网规划的分层最优化方法[J].中国电机工程学报,2003,23(10) :11-16. Cheng Haozhong,Gao Ciwei,Ma Zeliang,et al.The lexicographically stratified method for multi-object optimal electric power network planning[J]. Proceedings of the CSEE,2003,23(10):11-16(in Chinese). [4] 朱旭凯,刘文颖,杨以涵.综合考虑可靠性因数的电网规划新方法[J].电网技术,2004,28(21):51-54. Zhu Xukai,Liu Wenying,Yang Yihan.A new power network planning method by comprehensively considering system reliability factors[J].Power System Technology,2004,28(21):51-54(in Chinese). [5] Billinton R.Reliability evaluation of power systems[M].London (UK):Pitman Advanced Publishing Program,1984:258-277. [6] 李成榕,吕玉珍,崔翔,等.冰雪灾害条件下我国电网安全运行面临的问题[J].电网技术,2008,32(4):14-22. Li Chengrong,Lü Yuzhen,Cui Xiang,et al.Research issues for safe operation of power grid in China under ice-snow disasters[J].Power System Technology,2008,32(4):14-22(in Chinese). [7] Billinton R,Singh G D.Reliability assessment of transmission and distribution systems considering repair in adverse weather conditions [C].Proceedings of the 2002 IEEE Canadian Conference on Electrical and Computer Engineering,2002. [8] 张文亮,于永清,宿志一,等.湖南电网2008年冰雪灾害调研分析[J].电网技术,2008,32(4):1-5. Zhang Wenliang,Yu Yongqing,Su Zhiyi,et al.Investigation and analysis of icing and snowing disaster happened in Hunan power grid in 2008[J].Power System Technology,2008,32(4):1-5(in Chinese). [9] 潘力强,张文磊,汤吉鸿,等.2008年湖南电网特大冰灾事故综述[J].电网技术,2008,32(S2):20-25. Pan Liqiang,Zhang Wenlei,Tang Jihong,et al.Overview of the extraordinarily serious ice calamity to Hunan power grid in 2008 [J].Power System Technology,2008,32(S2):20-25(in Chinese). [10] 薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思(一)新的挑战与反思[J].电力系统自动化,2008,32(9):1-6. Xue Yusheng,Fei Shengying,Bu Fanqiang.Upgrading the blackout defense scheme against extreme disasters part I:New challenges and reflection[J].Automation of Electric Power Systems,2008,32(9):1-6(in Chinese). [11] 陈永进,任震,黄雯莹.考虑天气变化的可靠性评估模型与分析[J].电力系统自动化,2004,28(21):17-21. Chen Yongjin,Ren Zhen,Huang Wenying.Model and analysis of power system reliability evaluation considering weather change[J]. Automation of Electric Power Systems,2004,28(21):17-21(in Chinese). [12] 赵渊,徐焜耀,吴彬.大电力系统可靠性评估的蒙特卡洛仿真及概率密度估计[J].重庆大学学报,2007,30(12):16-20. Zhao Yuan,Xu Kunyao,Wu Bin.Bulk power system reliability assessment using Monte Carlo simulation and probability density estimation[J].Journal of Chongqing University,2007,30(12):16- 20(in Chinese). [13] 程林,郭永基.可靠性评估中多重故障算法的研究[J].清华大学学报,2001,41(3):69-72. Cheng Lin,Guo Yongji.Multiple fault assessment algorithm for reliability evaluation[J].Journal of Tsinghua University,2001,41(3):69-72(in Chinese). [14] Goldberg D E.A Comparative Analysis of Selection Schemes used in Genetic Algorithms[C].Foundations of Genetic Algorithms,San Mateo,CA,Morgan Kaufmann,1991. [15] 郑风雷,张尧,吴复立.基于帕累托改进准则的输电扩展规划[J].电网技术,2005,29(10):40-46. Zheng Fenglei,Zhang Yao,Wu Fuli.Transmission expansion based on pareto improvement criterion[J].Power System Technology,2005,29(10):40-46(in Chinese). [16] 王秀丽,李淑慧,陈皓勇,等.基于非支配遗传算法及协同进化算法的多目标多区域电网规划[J].中国电机工程学报,2006,26(12):11-15. Wang Xiuli,Li Shuhui,Chen Haoyong,et al.Multi-objective and multi-district transmission planning based on NSGA-II and cooperative co-evolutionary algorithm[J].Proceedings of the CSEE,2006,26(12):11-15(in Chinese). [17] 刘淳安,王宇平.约束多目标优化问题的进化算法及其收敛性[J].系统工程与电子技术,2007,29(2):277-280. Liu Chun’an,Wang Yuping.Evolutionary algorithm for constrained multi-objective optimization problems and its convergence[J]. Systems Engineering and Electronics,2007,29(2):277-280(in Chinese). [18] 王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:142-146. |
|||||||||||||||||||||||||||||||||||||||||||
| 本刊中的类似文章 | |||||||||||||||||||||||||||||||||||||||||||
| 1.孙瑜|Math Bollen|Graham Ault .孤岛状态下含分布式电源的配电系统可靠性分析[J]. 电网技术, 2008,32(23): 77-81 | |||||||||||||||||||||||||||||||||||||||||||
| 2.赵国波|刘天琪|李兴源|陈斌 .基于灰色机会约束规划的输电系统规划[J]. 电网技术, 2009,33(1): 22-25 | |||||||||||||||||||||||||||||||||||||||||||
| 3.麻常辉|梁军|杨永军|郭方正|刘亚丽 .基于蒙特卡罗模拟法的输电网灵活规划[J]. 电网技术, 2009,33(4): 99-102 | |||||||||||||||||||||||||||||||||||||||||||
| 4.刘 威|赵 渊|周家启|王成亮|胡 博|张禄琦|彭 鹄|田娟娟 .计及风电场的发输配电系统可靠性评估[J]. 电网技术, 2008,32(13): 69-74 | |||||||||||||||||||||||||||||||||||||||||||
| 5.刘友波 刘俊勇 唐杰明 .计及需求侧电量电价弹性矩阵与风险的供电公司周市场购电优化决策模型[J]. 电网技术, 2008,32(18): 18-24 | |||||||||||||||||||||||||||||||||||||||||||
| 6.丁明 李小燕 毕锐 王京景 .含VSC-HVDC的交直流混合发输电系统可靠性评估[J]. 电网技术, 2008,32(16): 53-58 | |||||||||||||||||||||||||||||||||||||||||||
| 7.王成文 王绵斌 谭忠富 谢品杰 .上网电价服从布朗运动条件下的销售电价计算模型[J]. 电网技术, 2008,32(9): 21-26 | |||||||||||||||||||||||||||||||||||||||||||
| Copyright by 电网技术 | |||||||||||||||||||||||||||||||||||||||||||