电网技术    2010 34 (2): 41-45   ISSN: 1000-3673  CN: 11-2410/TM  

不确定条件下的电压暂降概率评估
杨晓东,李庚银,周明,李国栋
电力系统保护与动态安全监控教育部重点实验室(华北电力大学),北京市 昌平区 102206
收稿日期 2009-11-25  修回日期 2009-07-29  网络版发布日期 2010-02-11
参考文献  

[1] 胡泽春,王锡凡,张显,等.考虑线路故障的随机潮流[J].中国电机工程学报,2005,25(24):26-33. Hu Zechun,Wang Xifan,Zhang Xian,et al.Probabilistic load flow method considering branch outages[J].Proceedings of the CSEE,2005,25(24):26-33(in Chinese). [2] 王守相,郑志杰,王成山.不确定条件下电力系统仿真的区间泰勒模型算法[J].中国电机工程学报,2008,28(7):46-50. Wang Shouxiang,Zheng Zhijie,Wang Chengshan.Power system simulation under uncertainty based on interval Taylor model arithmetic [J].Proceedings of the CSEE,2008,28(7):46-50(in Chinese). [3] Zhu H Y,Chen S.Identification of capacitor switching transients with consideration of uncertain system and component parameters[J].IEEE Trans on Power Delivery,2008,23(1):213-220. [4] 邓慧琼,艾欣,张东英,等.基于不确定多属性决策理论的电网连锁故障模式搜索方法[J].电网技术,2005,29(13):50-55. Deng Huiqiong,Ai Xin,Zhang Dongying,et al.Search technique for power system cascading outages based on uncertain multiple attribute decision-making[J].Power System Technology,2005,29(13):50-55(in Chinese). [5] 张敏,肖彬.配电系统电压衰减的概率评估方法[J].电工技术学报,2008,23(10):129-134. Zhang Min,Xiao Bin.Stochastic assessment method for voltage sags of power distribution system[J].Transactions of China Electrotechnical Society,2008,23(10):129-134(in Chinese). [6] 夏翔,黄伟,徐祥海,等.考虑小水电启停策略的准入容量计算[J].电力系统自动化,2006,30(22):48-52. Xia Xiang,Huang Wei,Xu Xianghai,et al.Penetration level calculation taking into consideration the unit commitment of small hydro power[J].Automation of Electric Power Systems,2006,30(22):48-52(in Chinese). [7] 钱科军,袁越,Zhou Chengke.分布式发电对配电网可靠性的影响研究[J].电网技术,2008,32(11):74-78. Qian Kejun,Yuan Yue,Zhou Chengke.Study on impact of distributed generation on distribution system reliability[J].Power System Technology,2008,32(11):74-78(in Chinese). [8] 胡金磊,张尧,郭力,等.多运行方式下发电机变量的概率特性计算[J].电力系统自动化,2007,31(11):39-43. Hu Jinlei,Zhang Yao,Guo Li,et al.Probabilistic characteristic calculation of generator variables under multi-operating conditions [J].Automation of Electric Power Systems,2007,31(11):39-43(in Chinese). [9] 戴伟华,李曼丽,熊宁.基于负荷区间的最小电压稳定域求解方法[J].电网技术,2009,33(17):119-123. Dai Weihua,Li Manli,Xiong Ning.A method to solve minimal voltage stability region based on load interval[J].Power System Technology,2009,33(17):119-123(in Chinese). [10] 熊宁,程浩忠,马则良,等.负荷不确定性电网的电压稳定性评价方法[J].电力系统自动化,2008,32(8):24-27. Xiong Ning,Cheng Haozhong,Ma Zeliang,et al.Voltage stability assessment method for power system with load uncertainty [J].Automation of Electric Power Systems,2008,32(8):24-27(in Chinese). [11] 邢洁,陈陈.不确定负荷下小干扰稳定的区间分析方法[J].电力系统自动化,2009,33(4):6-10. Xing Jie,Chen Chen.An interval analysis method of small-signal stability considering load uncertainty[J].Automation of Electric Power Systems,2009,33(4):6-10(in Chinese). [12] Bollen M H J.Fast assessment methods for voltage sags in distribution systems[J].IEEE Trans on Industry Applications,1996,32(6):1414-1423. [13] Bollen M H J.Method of critical distances for stochastic assessment of voltage sags[J].IEE Proceedings of Generation, Transmission and Distribution,1998,145(1):70-76. [14] 李妍,余欣梅,熊信银,等.电力系统电压暂降分析计算方法综述[J].电网技术,2004,28(14):74-78. Li Yan,Yu Xinmei,Xiong Xinyin,et al.A survey on calculation and analysis methods of volage sag[J].Power System Technology,2004,28(14):74-78(in Chinese). [15] Martinez J A,Martin-Arnedo J.Voltage sag studies in distribution networks(part I):system modeling[J].IEEE Trans on Power Delivery,2006,21(3):1670-1678. [16] Martinez J A,Martin-Arnedo J.Voltage sag studies in distribution networks(part II):voltage sag assessment[J].IEEE Trans on Power Delivery,2006,21(3):1679-1688. [17] Wang J,Chen S,Lie T T.System voltage sag performance estimation[J].IEEE Trans on Power Delivery,2005,20(2):1738-1747. [18] 宋云亭,郭永基,张瑞华.电压骤降和瞬时供电中断概率评估的蒙特卡罗仿真[J].电力系统自动化,2003,27(18):47-51. Song Yunting,Guo Yongji,Zhang Ruihua.Probabilistic assessment of voltage sags and momentary interruption based on Monte-Carlo simulation[J].Automation of Electric Power Systems,2003,27(18):47-51(in Chinese). [19] Park C H,Jang G,Thomas R J.The influence of generator scheduling and time-varying fault rates on voltage sag prediction[J].IEEE Trans on Power Delivery,2008,23(2):1243-1250. [20] Park C H,Jang G.Stochastic estimation of voltage sags in a large meshed network[J].IEEE Trans on Power Delivery,2007,22(3):1655-1664.


通讯作者: 杨晓东